SAIC used SIMUL8 to develop an integrative and interactive approach to optimize the manufacturing process design for the test flight article, the Ares 1-X Upper Stage Simulator (USS), for the future Ares 1 launch vehicle as part of NASA's program to return to the moon.



NASA

Key Facts

  • Highly complex project covering fabrication, material handling, integrated production schedules, limited skilled labor, and engineering development tasks executed in a highly complex team structure


  • SIMUL8's visualization helped to ignite process discussions among the process owners

  • Needed to understand how work flowed between the major manufacturing processes to provide more detail on this part of the overall USS IPT



  • SIMUL8 provided concrete evidence to justify altering the manufacture process

The Challenge


Science Applications International Corporation, Inc. (SAIC, NYSE: SAI) is a leading provider of scientific, engineering, systems integration and technical services and products to all branches of the U.S. military, agencies of the U.S. Department of Defense, the intelligence community, the U.S. Department of Homeland Security (DHS) and other U.S. Government civil agencies.



SAIC used SIMUL8 to develop an integrative and interactive approach to optimize the manufacturing process design for the test flight article, the Ares 1-X Upper Stage Simulator (USS), for the future Ares 1 launch vehicle as part of NASA's program to return to the moon.

The manufacturing concept is to divide the entire upper stage of the vehicle into a series of cylindrical segments (called tuna cans) that stack together.

Primarily two facilities were being used in manufacturing the USS at the Glenn Research Center (GRC). Of critical interest was the attainment of the individual segment departures from the two manufacturing facilities and the GRC.

The project was highly complex with many elements: fabrication and material handling, limited floor space, integrating the creation of fabrication equipment and techniques of some segments into the IPT plan, a limited pool of skilled labor and executing engineering development tasks in a highly complex team structure, with the work spread across multiple design teams and contractors.

Project Objectives:

  • Optimize the design, fabrication, and test approach(es) to ensure that all of the USS segments are manifested for transport
  • Optimize the utilization of team resources to achieve the targeted segment departure dates within budget for the USS IPT


"We chose SIMUL8 because it provides rapid model development, a high degree of control over entities within the simulation and superior graphical execution of the model that helps with troubleshooting and customer buy-in."

George Culver, Sr. Operations Research Analyst/Engineer at SAIC

The Result

SIMUL8 was used on the challenging process of manufacturing and mating the tuna cans in Building 50. Process details for the simulation were obtained from the process managers over repeated question-and-answer sessions as well as through weekly feedback sessions. This process helped mature the simulation, ignite process discussions among the process owners and gain confidence in results provided.



The resultant recommendations were considered to be highly effective by the USS IPT team and as a result, the IPT implemented the following changes:

  • Adopt a mechanized welding approach to minimize weld defects and subsequent rework
  • Shift design resources to finish the common segment design as quickly as possible
  • Adopt a crew-based approach to maximize crew skill level
  • Implement a schedule “dashboard” to increase visibility of segment manufacturing flow to the team and to the labor on the floor
  • Implement flange storage recommendations
  • Study moving the clock, mate and match drill and the secondary structure to Building 333

While the results obtained were directly beneficial, the study also helped the build team to consider aspects of their manufacturing problem and address fundamentals solely as part of collecting data to build the simulation.

SIMUL8 was cited by the program manager as providing the concrete results to justify altering the manufacture process to allow the team to deliver on schedule, contribute to the timely flight test of the new launch vehicle and subsequently allow the continuation of manned space flight.



Future Projects

As the NASA process managers gain better understanding of the process, the SIMUL8 model can be updated to investigate more dynamic routing for the order of tuna cans and the assignment of which tuna can is assembled on which stand.

See SIMUL8 in action

View videos of SIMUL8 and learn about the benefits of simulation.


Watch now

Request a SIMUL8 demo

Arrange a personalized online demonstration of SIMUL8 with one of our simulation experts.


Get a demo

Get in touch

If you would like more information, we're happy to help.


Contact us