Designing and Operating International Truck Inspection Stations

TransAnalysis specializes in computer simulations for engineering, planning and management. Using SIMUL8 they have developed animated simulations of staffed transportation inspection operations, and transportation facilities.

The transportation funding bill approved by the US Congress in November 2001 makes specific reference to additional inspection procedures to be carried out at key high volume crossings on the border between the United State and Mexico. These inspections will ensure full implementation of North American Free Trade Agreement (NAFTA) regulations on international trucking. As a result, several truck Inspection facilities are now under implementation at major Ports of Entry.

The Challenge
In order to successfully choose a site, then plan, design, and operate these inspection stations, the concerned agencies needed to:

  • Estimate the current and future size and capacity of each inspection component, such as parking lots and inspection bays, and develop a prototype layout;
  • Test the proposed prototype layout under different traffic scenarios, and develop and test recommendations to prevent traffic snarls and ensure efficient operations;
  • When applicable, estimate the traffic impacts of different proposed station sites, and use those as one of the criteria to select the best site,
  • Develop recommendations to use in the facilities' detailed schematics and construction plans,
  • Estimate the current and future staffing requirements for each station, and
  • When applicable, develop recommendations for scheduled implementation of the inspection components.

The Solution

Full Size Image | Animation

Simulation Screenshot

A border inspection facility has characteristics of two distinct programming problems. It consists of a traffic analysis problem, since it has roadways and controlled intersections; but it also has assembly line characteristics, such as service times, staffing requirements, and inspection points.

Using SIMUL8's capabilities that allow powerful modification of its pre-programmed features through visual logic and visual basic, TransAnalysis' senior simulation programmer was able to accurately simulate traffic merging, weaving, yielding, and traffic lights, together with staffing schedules and inspection time distributions.

TransAnalysis developed 22 simulations covering different site alternatives for the future inspection stations. These simulations required extensive input data that included traffic volumes, hourly distributions, turning movements at nearby intersections, service times and staffing requirements at each component, regulation compliance, signal cycles, and others.

The Result
The simulations were instrumental in developing and planning border inspection facilities at eight international Ports of Entry on the U.S.-Mexico border. The simulation results helped the concerned agencies design the facility size and its traffic flows; develop current and future staffing schedules; and select sites based on traffic impacts.

The simulations' animations and results were used in several public presentations to stakeholders at private, local, state and federal levels. They helped demonstrate that these inspection stations can be successfully operated within a reasonable staffing budget, without impeding international commerce or blocking local traffic, while providing adequate accommodations for trucking companies to correct most out-of-service conditions on-site.

"It is thanks to TransAnalysis' work that we can be confident that this facility will not cause addtional traffic congestion."
Luis A. Ramirez, PE Laredo District Director, Texas Department of Transportation.

 

next step header
  info icon graphic Call 1-800-547-6024  arrows graphic

folder icon graphic Free First Step arrows graphic

printer icon graphic Arrange a Demo arrows graphic


" Hertfordshire County Council has found this information to be invaluable. The Simul8 team were fast to respond, courteous to work with, and delivered to budget and time scale."

Dave Ramsey,
Principal Transport Planner Hertfordshire Highways

“I was extremely impressed with SIMUL8 Corporation. Their ability to understand our requirements, and design & build a solution in significantly less time than the alternative options, was fundamental to the success of the project. Furthermore, upon delivery our in-house engineers found the SIMUL8 product easier to use, and I therefore look forward to working with them on future projects.”
Andy Carr
Head of Engineering Support, British Nuclear Group
“The simulation model was absolutely key in demonstrating to our stakeholders that the capacity is there to serve our community's emergency needs.”
 David Rowlands
Project Director
NHS Aryshire & Arran Review of Services Project

“The high level of customer support, knowledge and experience offered by the SIMUL8 team is consistent with their impressive product offering.”

Ian Yeo
CRM Specialist
BT Global Services

| Home | About | Products | Solutions | Support | Purchase | Partners | Contact | Sitemap | Search | Privacy Policy |
© 2008 SIMUL8 Corporation. All Rights Reserved.