Taking Guesswork out of Capital Investment

To help take the guesswork out of capital investment, Knoll, a leading manufacturer of office furniture based uses simulation. Several of their projects were carried out with help from Visual8, a SIMUL8 Certified Solution Provider.


David Grubb, vice president of Advanced Technology for Knoll, details why and how his company uses SIMUL8.

When and why did Knoll first begin using SIMUL8?

Our first use of simulation software began about 1987. That product was very complex and required significant training to use. Eventually the software became shelfware. Still, we retained an interest in simulation as well as optimism regarding its potential.

KnollWe found SIMUL8 and trials showed that it was intuitive in use and yielded valid results. The ease of use allowed, with minimal training, the design engineer to input the data directly and to see the interaction of subtle variations first hand.

Ready to Find out more?

Try one of our free resources:

An additional advantage is that we can load a production run of mixed product into an Excel spreadsheet and simulate a week or more of actual production. The software “runs” on the production lists in exactly the same sequence it would run on the machines.

What types of equipment or systems has Knoll evaluated with SIMUL8?

We find the most value in evaluating more complex processes that involve multiple CNC work centers or production cells comprised of any combination of machines working in concert.

The easiest areas are ones with the greatest level of automation, where the output is machine paced. Simple one or two-machine cells operated by a single operator can normally be evaluated mathematically and tend to be intuitive in nature.

The most difficult are those that are more variable by virtue of having high manual labor involvement, such as a press line. They can be very difficult to analyze accurately by more traditional mathematical models. The effect of the manual involvement is most influential on throughput when it is at the infeed to a machine or cell. Manual unloading of a machine has fewer variables since it is more influenced by the pace of the machine. The software has the ability to input these variables, but at times they are difficult for the engineer to define accurately.

Can you provide an example of how Knoll uses the software, including a description of how Knoll simulates a production environment on a computer?

To do a valid simulation of machine lines it is necessary for the engineer to have a detailed understanding of both the equipment and the realities of the shop environment. Items affecting throughput, such as breakdowns, paperwork, tool changes and material handling, all must be defined and entered into the set-up to yield valid results.

As an example of a complex application, we recently simulated the output requirements of a new automated Buerkle short-cycle though-feed press line that produces both HPL and wood veneer products of multiple thickness for five subsequent production lines and cells. These “customers” of the press line operate varying numbers of shifts and run a wide variety of products. The average lot size of the lines being supplied is less than 10, resulting in constant demand for output variation of the press line. Some “customers” operate three shifts while the press only runs two shifts.

The computer model offered us the ability to simulate the “customers’ demands” from actual production runs and develop the demand on the press line in a pull-through process. Once the demand was developed for the press line, required cycle times could also be developed. These required cycle times then became the basis for the design of the automation of the lay-up as well as in feed and out feed designs. This is an example of using simulation not only to evaluate an application, but also as an aid in defining and evaluating design criteria.

The same simulation also allowed us to determine conflict areas for the in feed of the multiple cores, faces and backers being used, as well as to define the required sizes of work-in-process surge areas between the press line and its “customers.” The conflict (contention) areas, as well as surge area issues, become apparent as soon as the animation is run. Data which defines the magnitude, frequency and duration of any conflicts is collected by the program over the length of the run simulation and this information can then be used to run “what if” variations as an aid in resolving any issues.

Above, screenshot of Knoll's Warehouse Simulation.
Full Size Image.

The process of building the required cost-justification model results directly from the production simulation model. Payback for this example was just under three years.

Anything you have been dying to tell us that I have neglected to ask?

Yes. Simulation can be used as a tremendous “sales tool” when competing for capital funding. It provides the ability to show management, in both animation and numbers process alternatives and results.

More