SIMUL8 Newsletter
  Monthly newsletter with news on releases, events and special offers. Learn from case studies, hints and tips and how to articles.



 

SIMUL8 Screenshots

These screenshots show some simulation applications and describe the objective and performance measures. For more information about whether SIMUL8 can simulate an application email: .

Manufacturing

 
 

Palletized Test Cell

 

Objective: Determine the 'pallets' required in an electronic manufacturing cell.

Performance Measures: Throughput; % time production is held up by pallet starvation.
View full size screenshot

     
 

Theory of Constraints

Objective: Show how TOC principals can be demonstrated using simulation.

Performance Measures: Machine Utilization; Throughput; WIP; Cycle Time.
View full size screenshot

 
 

Buffer Choice

 

Objective: Shows how using buffers of different sizes effects the flow of work.

Performance Measures:% machine blocked; % machine starved.
View full size screenshot

 
 

Pick and Pack Line

Objective: Configure staff on line to maximize Total Dispatched. Experiment with different order levels.

Performance Measures: Total Dispatched; Average Time to Dispatch; Operator % Utilization.
View full size screenshot

 
 

Repair Cell

 

Objective: Determine staffing requirements for a repair cell.

Performance Measures: Throughput; WIP; Staff Utilization.
View full size screenshot

 
 

Ford Transit Manufacture

 

Objective: Determine time and total vehicle weight for weekly truck departure.

Performance Measures: Truck Time; Truck Weight on Departure.

View large screenshot

     
 

Motor Manufacture

 

Objective: Test Lean Manufacturing ideas in Motor Manufacturing Plant.

Performance Measures: Total WIP; Throughput; % Orders Completed.

View large screenshot
View Visual Logic Code: Screenshot; Text format

 

Logistics

 
 

Supply Chain

 

Objective: Determine reorder quantities and safety stock levels between Manufacturer and Supplier.

Performance Measures: Parts Waiting Delivery; Average Lead Time; Successful Deliveries.
View full size screenshot

     
 

Airport

 

Objective: Experiment with the number of runways and airspace required to manage an increase in demand.

Performance Measures: Planes Landed/Departed; Planes diverted.
View full size screenshot

     

Communication

 
 

911 Call and Dispatch Center

 

Objective: Determine the number of staff required for an 911 Call Center to meet key performance measures.

Performance Measures: Calls Received; Queuing Times; Dispatched Incidents; Incidents Resolved Without Dispatch.
View full size screenshot

 
 

IT Help Desk

 

Objective: Determine the staff required to man an IT help desk that serves Gold, Silver and Bronze customers.

Performance Measures: Waiting Time; Calls Lost; Hang Ups; Calls Resolved.
View full size screenshot

 

Healthcare

 
 

Clinic

 

Objective: Determine the staff required to minimize Patient Waiting Time in a Hospital Clinic.

Performance Measures: Patient Waiting Time; Doctor % Utilization.
View full size screenshot

 
 

Hospital

 

Objective: Determine effect of adding an Acute Receiving Ward to a modern Healthcare Facility.

Performance Measures: Max Beds Available; Bed Days Available; Acute Receiving Bed Days Used.
View full size screenshot

     

Services

 
 

Grocery Store

 

Objective: Experiment with staff levels to meet service level requirements.

Performance Measures: Customer Queuing Time; Customers Served.
View full size screenshot